Battery replacement Job in Rail Line network- Dubai
The Battery Replacement Project for the Dubai Rail Line Network, completed in May 2024, involved replacing the batteries in the UPS systems across Dubai’s extensive rail line network. A total of 792 Yuasa SWL2500E/EFR batteries, sourced from a reputable European brand, were installed. This project aimed to enhance the reliability and efficiency of the UPS systems, ensuring uninterrupted power supply to critical railway infrastructure. By upgrading the battery systems, the overall performance and resilience of the rail network were significantly improved.
Completed in : May 2024
Completed in : May 2024

Battery replacement Job for Datacentre in Abu Dhabi Marine facility
This project involves replacing the batteries in a reputed brand 80 and 60 KVA UPS system located at a datacenter within the Abu Dhabi Marine facility. A total of 420 Leoch LHR12560W batteries will be installed to ensure the UPS system’s reliable and uninterrupted power supply, safeguarding critical IT infrastructure and operations.
Completed in : September 2024
Completed in : September 2024

Battery Replacement Job at UAE Airport
SMETME successfully completed a battery replacement project at a major airport in the UAE. The project involved the installation of 64 Exide Sprinter XP12V2500 batteries to ensure reliable and uninterrupted power supply for critical airport operations. This upgrade enhanced the UPS system’s performance and extended its lifespan, contributing to the airport’s overall efficiency and safety.
Completed in : September 2023
Completed in : September 2023

Battery replacement Job in Major Data Centers in UAE
The Battery Replacement Project for the Dubai Rail Line Network, completed in May 2024, involved replacing the batteries in the UPS systems across Dubai’s extensive rail line network. A total of 792 Yuasa SWL2500E/EFR batteries, sourced from a reputable European brand, were installed. This project aimed to enhance the reliability and efficiency of the UPS systems, ensuring uninterrupted power supply to critical railway infrastructure. By upgrading the battery systems, the overall performance and resilience of the rail network were significantly improved.
Yuasa SWL2500EFR (Quantity: 432 pcs)
Yuasa SWL2300EFR (Quantity: 1548 Pcs)
Yuasa SWL1800FR (Quantity: 492 Pcs)
Completed in : December 2023
Yuasa SWL2500EFR (Quantity: 432 pcs)
Yuasa SWL2300EFR (Quantity: 1548 Pcs)
Yuasa SWL1800FR (Quantity: 492 Pcs)
Completed in : December 2023

Battery Installation for Major Bank in Abu Dhabi
SMETME successfully completed a critical battery installation project for a major bank in Abu Dhabi. The project involved installing HBL KBH118P Nickel 1.2V, 118AH Cells in 20 units across 4 sets to ensure seamless power backup. Supported by a high-performance European generator, the installation guarantees reliable and uninterrupted power supply, aligning with the bank’s operational needs.
Completed in : November 2022
Completed in : November 2022

Battery Replacement Job in Major Data Center, UAE
SMETME successfully completed a critical battery replacement project for a leading data center in the UAE. The project involved replacing the batteries of a European brand UPS system with 400 Exide Sprinter XP12V2500 batteries. This comprehensive operation ensured the uninterrupted power supply and optimal performance of the data center’s critical infrastructure.
Completed in : May 2021
Completed in : May 2021
Long term Projects

Long Term Pricing Agreement
- AG MELCO ELEVATOR CO., LLC
- MITSUBHISHI
- KONE MIDDLE EAST
- EMIRATES GLOBAL ALUMINIUM
- GENERAL CIVIL AVIATION AUTHORITY
- THE EMIRATES GROUP- DNATA